Catalyst Portal
45 results found
-
Bulk change targets on maintenace levels
Can we make bulk changes to targets but with relation to setting them on a maintenance level without editing 1 by 1? For example, I see a bunch of targets that are listed with a status of "closed" but I want to move all of them into daily maintenance.
5 votes -
Arrange Targets in True Number Order
Targets that start with numbers (ex: for the ABLLS assessment) don't sort in true numerical order (1-20, etc). All of the targets that start with 1 are first, then all the the targets that start with 2, etc. It can be avoided by putting a zero in front of everything, but that's not how we naturally number things.
4 votes -
Prompt Delay
Allow prompt delay setting to be applied to only some programs/targets
1 vote -
Override Minimum Number of Trials/Day
I would like the desired daily trials (set to each goal) to override minimum number of trials per day (set to each student)
I share catalyst with ST/ABA/OT and we often have different desired trials for mastery. Therefore, we often have to manually master out goals, which is very time consuming
3 votes -
Task analysis step mastery
Have an automatic mastery of steps in TA. When a step has hit the mastery criteria, disable the step and enable next step.
3 votes -
Auto-Open Programs
Have an auto-open order for programs once all targets have been mastered in a single program.
1 vote -
Mastery Lines
After mastering out a target, the mastered line automatically becomes a dashed-dotted line. It would be beneficial to have a setting or feature where the user could select what type of line would be used for mastered targets.
Example: Johnny mastered the last target for 1-step directions. I master out the target and check my graph. The mastered line automatically becomes a solid line (instead of the default setting of a dashed-dotted line).
35 votes -
Hold Criteria
Add hold criteria, in which after a certain amount of days with data at or below a specific level, targets are automatically placed on hold.
1 vote -
Change prompt schedule system
The prompt schedule system that catalyst uses causes data collection issues and overall confusion among our staff members. It would be much easier if you had the prompt schedule feature work in tandem with automatic mastery in that when a criteria is met, it would automatically move to the next prompt in the schedule and would not master out the target until mastery criteria was met on all prompts. For example, a prompt schedule could read: Hand over Hand, Wrist, Elbow, Shoulder, Independent. If that prompt schedule was linked to automatic mastery, it could populate a condition line any time…
4 votes -
Desired daily trials goes towards mastery criteria
I think it would be helpful for the desired daily trials to override the minimum trial count for mastery criteria. There are some goal that require more trials than others and some goals that don't require as many. So the daily desired amount for each goal should specify what is needed for mastery.
7 votes -
Data line connecting over non-data days
I would ask that the data line be discontinuous so as to not connect Fridays data to Mondays.
2 votes -
Generalization setting
I think it would be really beneficial if there were a generalization setting. For example, you could set it so that after the target meets criteria with current materials, it moves to a generalization phase before mastering out
5 votes -
mastery criteria linked to another
Group mastery. Link the mastery criteria of one target to that of __ number of others. So that when running receptive identification in an array, for instance, one target doesn't master out before the others; Rather, they master out as a set.
1 vote -
Ability to Upload Program Objectives
The ability to upload the objective (i.e., "goal name for reporting") for an entire program rather than individual targets into curricula. Upon uploading curriculum, this section is always blank. Having to enter this manually for every single program is extremely time consuming for clinicians.
4 votes -
Skill area progress
I think it would be very helpful to be able to pull up percentages and graphs for an entire skill area vs just targets. Many of us report on entire skill area vs individual targets to funders.
5 votes -
1 vote
-
Auto progression for prompts to not graph as independent or allow choice
Right now, if you set up prompt codes with auto progression all data shows as independent in the graph making the graph that populates in reports inaccurate. It would be great if there was a button to determine if you want it to plot as independent or not when using auto progression for prompting so graphs would be more accurate
2 votes -
Mark as Known
We would love to be able to enter targets for baseline/probe, and then have the option to mark the target as "known" if it is over criterion in baseline. Currently, the only option is to "master out" the target. This implies that we taught it/mastered it through instruction, and is misleading on reports. However, we want to be able to have these targets in the system so that we can record probe data on them, without having it look like they're "mastered." Also, known targets are good to keep in for discrimination training, while teaching other unknown targets in the…
2 votes -
Minimum Number of Trials Required
Currently, you are only able to set the minimum number of daily trials for a target to be counted toward mastery. It would be beneficial if we could change that number on a by target level, for instances when we have program that has low frequency throughout the day (i.e., certain mealtime behaviors).
1 vote -
mastery criteria tied to set
It would be great to be able to tie targets together for mastery criteria so that 1 target in a set couldn't master out before the others. Thanks.
7 votes
- Don't see your idea?